Advisories

Check below for weekly travel advisories at Port Authority facilities. It is important to note that the content below does not list alerts for current travel conditions. It only lists foreseen conditions that will impact traffic, such as construction and roadwork.

To find out about current traffic conditions, check out our alerts page.

  • George Washington
    Bridge
  • Lincoln
    Tunnel
  • Holland
    Tunnel
  • Staten Island
    Bridges
  • PATH
  • Newark Liberty
    Airport
  • Other
    Events

George Washington Bridge (GWB)

Direction Dates Closures
TO NEW YORK (EASTBOUND) Thursday, March 18, 11 p.m. until 5 a.m. Friday morning Two of three eastbound upper level expressway lanes (under Broadway) will be closed. (Routine Maintenance)
TO NEW JERSEY (WESTBOUND) Friday, March 12, 11:59 p.m. until 8 a.m. Saturday morning
Monday – Thursday, March 15 – 18, 11 p.m. until 5 a.m. the following morning
Two of three westbound upper level expressway lanes (under Broadway) will be closed. (Routine Maintenance)
TO NEW JERSEY (WESTBOUND Wednesday & Thursday, March 17 & 18, 11 p.m. until 5 a.m. the following morning Two of four westbound upper level bridge lanes will be closed at mid-span. (Routine Maintenance)

 

Around-the-clock, until further notice

All Trucks must use the upper level of the George Washington Bridge. Violators subject to summons and/or fine.

GWB Sidewalk Hours of Operation

Bicyclists using the sidewalk are asked to walk their bikes for the safety of all sidewalk users. Bicyclists who choose to ride are asked to exercise caution and ride slowly. Pedestrians have the right-of-way at all times.

Users of the GWB sidewalk are encouraged to sign up for Bridge & Tunnel Alerts at http://btt.paalerts.com. Select the "Bicyclists/Pedestrian" Customer Type to have free alerts regarding sidewalk closures sent to your cell phone, BlackBerry, or e-mail account.

SOUTH SIDEWALK OPEN – NORTH SIDEWALK CLOSED

Friday – Thursday, March 12 – March 18, 6 a.m. until 11:59 p.m. each day

ADVANCE NOTICE

NORTH SIDEWALK OPEN – SOUTH SIDEWALK CLOSED
Monday – Friday, March 22 – April 2, 6 a.m. until 11:59 p.m. each day

Lincoln Tunnel

Direction Dates Closures
BOTH DIRECTIONS (EASTBOUND & WESTBOUND) Saturday, March 13, 1 a.m. until 9 a.m.
Sunday, March 14, 2 a.m. until 10 a.m.
Tuesday – Thursday, March 16 – March 18, 11 p.m. until 5 a.m. the following morning
One tube of the Lincoln Tunnel will be closed to traffic. Weeknights, two additional tunnel lanes in each direction will be closed at 12:30 a.m., traffic permitting, leaving one lane in each direction available. (Routine Maintenance)
TO NEW YORK (EASTBOUND) Tuesday, March 16, 11 p.m. until 5 a.m. Wednesday morning All lanes of the inbound Lincoln Tunnel helix will be closed to traffic. Motorists will follow signs for access to the Lincoln Tunnel to New York. (Routine Maintenance)
TO NEW JERSEY (WESTBOUND) Sunday & Monday, March 14 & March 15, 11 p.m. until 5 a.m. the following morning The New Jersey–bound north tube will be closed to traffic. Customers are advised to access the Lincoln Tunnel via the center tube using entrances at 36th Street and 9th Avenue, or 30th, 31st or 33rd Streets between 9th and 10th Avenues. (Routine Maintenance)

 

Holland Tunnel

Direction Dates Closures
TO NEW YORK (EASTBOUND) Sunday – Thursday, March 14 – March 18, 11 p.m., traffic permitting, until 5 a.m. the following morning One lane will be closed to traffic. (Routine Maintenance)
TO NEW JERSEY (WESTBOUND) Sunday – Thursday, March 14 – March 18, 11 p.m., traffic permitting, until 5:30 a.m. the following morning One lane will be closed to traffic.(Routine Maintenance)

 

HOLLAND TUNNEL COMMERCIAL VEHICLE RESTRICTIONS

Commercial vehicles in classes 2 & 3 (two- & three-axle single unit trucks) are permitted to use the Holland Tunnel in both directions.

The ban on tractor-trailers and larger trucks in classes 4, 5 and 6 (four, five and six-axle trucks), three-axle dual-unit trucks, trailers, and towed vehicles remains in effect IN BOTH DIRECTIONS at all times. Operators of these vehicles are encouraged to use the Lincoln Tunnel and George Washington Bridge as alternatives.

Goethals Bridge Sidewalk Closure

The pedestrian sidewalk is closed around-the-clock, until further notice.

PATH

Journal Square – 33rd Street via Hoboken (JSQ-HOB-33)
Newark – World Trade Center (NWK – WTC)

Day Closures
Saturday, March 13 Service will operate on a normal weekend schedule.
Sunday, March 14 Service will operate on a normal weekend schedule.

Notes

Christopher Street Station will be closed for cleaning from 11:59 p.m. Sunday until 5 a.m. Monday morning. Customers are advised to enter PATH via Ninth Street Station.

Riders are reminded that eating, drinking, and smoking are not permitted on PATH.

Follow PATH on Twitter at http://www.twitter.com/pathtweet

Subscribe to PATHAlerts at http://www.paalerts.com/alertsignup.aspx to receive cell phone or e-mail notifications of incidents or events that may delay your trip on PATH.

Have trips on your PATH SmartLink card refilled automatically. Sign up for Automatic Replenishment at http://www.pathsmartlinkcard.com/AutomaticReplenishment.html

For additional information regarding PATH service, please call 800 234-PATH/7284 or visit PATH’s Web site

Newark Liberty Airport

Dates Notice
Ongoing New Arrivals Level
The Terminal B mid-level roadway (previously known as the arrivals level roadway) is now closed. All passenger pick ups, both international and domestic, are being made on the new arrivals level, located on the lower level of Terminal B. Taxi service is still available at the mid-level and is located at the lower level of the terminal.

Other Events

No Events to Report.

 


Web Site Disclaimer
© 2001-2010 The Port Authority of New York and New Jersey. All Rights Reserved.

The Port Authority of New York and New Jersey
(212) 435-7000  •  225 Park Avenue South, New York, NY 10003