Check below for weekly travel advisories at Port Authority facilities. It is important to note that the content below does not list alerts for current travel conditions. It only lists foreseen conditions that will impact traffic, such as construction and roadwork.
To find out about current traffic conditions, check out our alerts page.![]()
| Direction | Dates | Closures |
|---|---|---|
| TO NEW YORK (EASTBOUND) |
Tuesday, May 28, 10 p.m., traffic permitting, until 5 a.m. Wednesday morning Wednesday, May 29, 10 p.m., traffic permitting, until 5 a.m. Thursday morning Thursday, May 30, 10 p.m., traffic permitting, until 5 a.m. Friday morning |
Two of four eastbound upper level bridges lanes, the rightmost eastbound upper level expressway lane (under the apartments), and all lanes of the eastbound lower level are closed. Significant eastbound delays are expected. (Priority Steel and Concrete Repairs Biennial Inspections) |
| TO NEW JERSEY (WESTBOUND) | There are no scheduled roadway closures to report at this time. |
All Trucks must use the upper level of the George Washington Bridge. Violators subject to summons and/or fine.
Bicyclists using the sidewalk are asked to walk their bikes for the safety of all sidewalk users. Bicyclists who choose to ride are asked to exercise caution and ride slowly. Pedestrians have the right-of-way at all times.
Users of the GWB sidewalk are encouraged to sign up for Bridge & Tunnel Alerts at http://btt.paalerts.com. Select the "Bicyclists/Pedestrian" Customer Type to have free alerts regarding sidewalk closures sent to your cell phone, smart phone, or e-mail account.
| Sidewalk Open | FRI 5/24 | SAT 5/25 | SUN 5/26 | MON 5/27 | TUE 5/28 | WED 5/29 | THU 5/30 |
|---|---|---|---|---|---|---|---|
| 6AM – 11:59PM | SOUTH | SOUTH | SOUTH | SOUTH | SOUTH | SOUTH | SOUTH |
GWB Sidewalk Hours of Operation are subject to change and may be impacted by events such as inclement weather. To be notified of GWB sidewalk closures, please subscribe to Bridge & Tunnel Alerts at http://btt.paalerts.com/subscribe.aspx and select "George Washington Bridge Sidewalk" from the "Choose Facility" list.
A construction project on I-95 Cross-Bronx Expressway may cause significant delays, including on the George Washington Bridge. Plan accordingly, and call 511 or check http://www.511NJ.org for details.
| Direction | Dates | Closures |
|---|---|---|
| TO NEW YORK (EASTBOUND) |
Friday, May 24, 11:59 p.m. until 8 a.m. Saturday morning Thursday, May 30, 11 p.m. until 5 a.m. Friday morning |
The New-York bound south tube is closed. (Routine Maintenance) |
| TO NEW YORK (EASTBOUND) |
Friday, May 24, 11:59 p.m. until 8 a.m. Saturday morning Tuesday, May 28, 10:30 p.m. until 5 a.m. Wednesday morning Wednesday, May 29, 10:30 p.m. until 5 a.m. Thursday morning Thursday, May 30, 10:30 p.m. until 5 a.m. Friday morning |
All lanes of the inbound Lincoln Tunnel Helix are closed. Motorists detoured to alternate routes. (Lincoln Tunnel Helix Rehabilitation Project) |
| TO NEW JERSEY (WESTBOUND) | Monday, May 27, 11 p.m. until 5 a.m. Tuesday morning | The New-Jersey bound north tube is closed. Customers advised to access the Lincoln Tunnel via the center tube using entrances at 36th Street and 9th Avenue, or 30th, 31st or 33rd streets between 9th and 10th avenues. (Routine Maintenance – Includes, but not limited to, the following: washing, sweeping, lighting, gutter cleaning and pump room inspections.) |
| TO NEW JERSEY (WESTBOUND) | Tuesday, May 28, 11:59 p.m. until 4:30 a.m. Wednesday morning | All lanes of the outbound Lincoln Tunnel Helix are closed. Motorists detoured to alternate routes.(Routine Maintenance) |
| TO NEW JERSEY (EASTBOUND & WESTBOUND) |
Tuesday, May 28, 11 p.m. until 5 a.m. Wednesday morning Wednesday, May 29, 11 p.m. until 5 a.m. Thursday morning |
One tube of the Lincoln Tunnel is closed. Weeknights, one additional tunnel lane in each direction closes at 12:30 a.m., traffic permitting, leaving one lane in each direction available. (Routine Maintenance – Includes, but not limited to, the following: washing, sweeping, lighting, gutter cleaning and pump room inspections.) |
| Direction | Dates | Closures |
|---|---|---|
| TO NEW YORK (EASTBOUND) |
Monday, May 27, 11 p.m., traffic permitting, until 5 a.m. Tuesday morning Tuesday, May 28, 11 p.m., traffic permitting, until 5 a.m. Wednesday morning Wednesday, May 29, 11 p.m., traffic permitting, until 5 a.m. Thursday morning Thursday, May 30, 11 p.m., traffic permitting, until 5 a.m. Friday morning |
One eastbound tunnel lane is closed.(Routine Maintenance – Includes, but not limited to, the following: tunnel wall washing) |
| TO NEW JERSEY (WESTBOUND) |
Monday, May 27, 11 p.m., traffic permitting, until 5:30 a.m. Tuesday morning Tuesday, May 28, 11 p.m., traffic permitting, until 5:30 a.m. Wednesday morning Wednesday, May 29, 11 p.m., traffic permitting, until 5:30 a.m. Thursday morning Thursday, May 30, 11 p.m., traffic permitting, until 5:30 a.m. Friday morning |
One westbound tunnel lane is closed. (Routine Maintenance – Includes, but not limited to, the following: tunnel wall washing) |
Both Directions: (EASTBOUND & WESTBOUND)
Only two and three-axle single-unit trucks allowed.
Height Limit - 12 feet 6 inches
Width Limit - 8 feet
OTHER AGENCIES' WORK THAT MAY IMPACT USERS OF THE HOLLAND TUNNEL
NEW TRAFFIC PATTERN ALONG HUDSON STREET AND AT CANAL STREET ENTRANCE TO HOLLAND TUNNEL DURING ESSENTIAL WATER MAIN INSTALLATION
The New York City Department of Design and Construction announced traffic pattern changes on Hudson Street and at the Canal Street entrance to the Holland Tunnel that took effect September 19, 2010.
These changes are necessary to install new trunk water mains and reconstruct existing distribution water mains and utility infrastructure along Hudson Street and adjacent streets in the Tribeca West Historic District. A significant element of the project is the construction of a new trunk water main that will be connected to City Water Tunnel No. 3.
Motorists should follow detour signs to reach the tunnel via West Street and Canal Street or may use the Varick and Watts Street approaches. The work hours will be Monday-Friday from 7 a.m. to 10 p.m. and, when necessary, weekend hours will be 10 a.m. to 10 p.m.
The following traffic pattern changes will be in effect through the project's completion in 2015.
Traffic Pattern Changes
Traffic Mitigation Measures
| Direction | Dates | Closures |
|---|---|---|
| TO NEW YORK (SOUTHBOUND) | There are no scheduled roadway closures to report at this time. | |
| TO NEW JERSEY (NORTHBOUND) | There are no scheduled roadway closures to report at this time. |
| Direction | Dates | Closures |
|---|---|---|
| TO NEW YORK (EASTBOUND) |
Monday, May 27, 11:59 p.m., traffic permitting, until 5 a.m. Tuesday morning Tuesday, May 28, 10 p.m., traffic permitting, until 5 a.m. Wednesday morning Wednesday, May 29, 10 p.m., traffic permitting, until 5 a.m. Thursday morning Thursday, May 30, 10 p.m., traffic permitting, until 5 a.m. Friday morning |
One eastbound bridge lane is closed. (Roadway & Sign Lighting Repairs) |
| TO NEW YORK (WESTBOUND) | Tuesday, May 28, 10 p.m., traffic permitting, until 5 a.m. Wednesday morning Wednesday, May 29, 10 p.m., traffic permitting, until 5 a.m. Thursday morning Thursday, May 30, 10 p.m., traffic permitting, until 5 a.m. Friday morning |
One westbound bridge lane is closed. (Pothole Repairs) |
| Direction | Dates | Closures |
|---|---|---|
| TO NEW JERSEY (EASTBOUND) | Tuesday, May 28, 10 p.m., traffic permitting, until 5 a.m. Wednesday morning | One eastbound bridge lane is closed. (Roadway & Sign Lighting Repairs) |
| TO NEW JERSEY (EASTBOUND) | Wednesday, May 29, 10 p.m., traffic permitting, until 5 a.m. Thursday morning | One eastbound bridge lane, and the high-speed E-ZPass lanes, are closed. (Roadway & Sign Lighting Repairs) |
| TO NEW JERSEY (WESTBOUND) | Monday, May 27, 10 p.m., traffic permitting, until 5 a.m. Tuesday morning | One westbound bridge lane is closed. (Roadway & Sign Lighting Repairs) |
Passengers are reminded that smoking, eating, drinking, and carrying open food containers and alcoholic beverages on trains and in station areas, is strictly prohibited.
Follow PATH on Twitter: http://www.twitter.com/pathtrain
Subscribe to PATHAlerts at http://www.paalerts.com/alertsignup.aspx to receive cell phone or e-mail notifications of incidents or events that may delay your trip on PATH.
Have trips on your PATH SmartLink card refilled automatically. Sign up for Automatic Replenishment online: http://www.pathsmartlinkcard.com/AutomaticReplenishment.html
For additional information regarding PATH service, please call 800 234-PATH/7284 or visit PATH online: http://www.panynj.gov/path
SATURDAY, May 25
Newark–World Trade Center (NWK-WTC)
Journal Square–33rd Street via Hoboken (JSQ-HOB-33)
SUNDAY, May 26
Newark–World Trade Center (NWK-WTC)
Journal Square–33rd Street via Hoboken (JSQ-HOB-33)
MONDAY, May 27 [Memorial Day]
Newark–World Trade Center (NWK-WTC)
Journal Square–33rd Street via Hoboken (JSQ-HOB-33)
| STATION(S) | NOTE |
|---|---|
| 14 St & 23 St | During overnight hours, all PATH service at 14 St Station or 23 St Station may operate from that station's uptown or downtown track. Signage is posted at that the entrance of the affected station(s) when this single-track operation is in effect. |
| 33 St | Passageway from PATH to NYC Subway N, Q, and R trains closed daily from 11 p.m. to 5 a.m. Use NYC Subway entrance at 34 St & 6 Av. |
There are no temporary bus gate reassignments to report.
There are no temporary bus gate reassignments to report.
Starting March 8, 2011, NYC DOT has instituted a new traffic pattern on the Belt Parkway at the Fresh Creek Bridge that will affect eastbound traffic to JFK. This new traffic pattern is expected to remain in place for at least 18 months. Please allow additional time if you are planning to use the eastbound Belt Parkway to reach JFK.
There are no events to report at this time.
There are no events to report at this time.
| Date | Time | Event | Location |
|---|---|---|---|
| Friday, May 24, 2013 | No events to report. | ||
| Saturday, May 25, 2013 | No events to report. | ||
| Sunday, May 26, 2013 | No events to report. | ||
| Sunday, May 27, 2013 | No events to report. |