Weekly Traffic Advisories

Weather Advisory

Check below for weekly travel advisories at Port Authority facilities. It is important to note that the content below does not list alerts for current travel conditions. It only lists foreseen conditions that will impact traffic, such as construction and roadwork.

To find out about current traffic conditions, check out our alerts page

  • George Washington
    Bridge
  • Lincoln
    Tunnel
  • Holland
    Tunnel
  • Staten Island
    Bridges
  • PATH
  • Port Authority
    Bus Terminal
  • Airports
  • AirTrain
    JFK
  • AirTrain
    Newark
  • Other
    Events

George Washington Bridge (GWB)

Direction Dates Closures
TO NEW YORK (EASTBOUND) Friday, August 1, 10 p.m. until 10 a.m. Saturday morning The eastbound lower level, and the ramp from 9A to the eastbound lower expressway, are closed.
(Routine Maintenance)
TO NEW YORK (EASTBOUND) Friday, August 1, 9 p.m. until 7 a.m. Saturday morning

Saturday, August 2, 9 p.m. until 7 a.m. Sunday morning

Sunday, August 3, 9 p.m. until 7 a.m. Monday morning
The northbound express I-95 lanes are closed.
(New Jersey Turnpike Work)
TO NEW YORK (EASTBOUND) Thursday, August 7, 9 p.m. until 5 a.m. Friday morning

Friday, August 8, 10 p.m. until 10 a.m. Saturday morning
Two rightmost eastbound upper level bridge lanes, and the Palisades Interstate Parkway approach to the eastbound upper level, are closed. At 11 p.m., a third eastbound upper level bridge lane is closed, leaving one eastbound upper level bridge lane available.

Significant eastbound delays expected. Car operators advised to use eastbound lower level, which operates in FULL SERVICE mode and is staffed to handle both cash and E-ZPass transactions. Truck operators MUST use eastbound upper level and should budget extra time.
(Bridge Deck Rehabilitation)
TO NEW YORK (EASTBOUND) Friday, August 8, 11:59 p.m. until 8 a.m. Saturday morning Two leftmost eastbound upper level bridge lanes closed through the expressway.
(Routine Maintenance)
TO NEW JERSEY (WESTBOUND) Monday, August 4, 11 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 11 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 11 p.m. until 5 a.m. Thursday morning

Thursday, August 7, 11 p.m. until 5 a.m. Friday morning

Friday, August 8, 11:59 p.m. until 8 a.m. Saturday morning
Two leftmost westbound lower level bridge lanes closed through the expressway.
(Routine Maintenance)
TO NEW JERSEY (WESTBOUND) Monday, August 4, 11 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 11 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 11 p.m. until 5 a.m. Thursday morning

Thursday, August 7, 11 p.m. until 5 a.m. Friday morning

Friday, August 8, 11:59 p.m. until 8 a.m. Saturday morning
The rightmost westbound upper level bridge lane closed through the expressway.
(Routine Maintenance)

GEORGE WASHINGTON BRIDGE VEHICULAR RESTRICTIONS

All Trucks must use the upper level of the George Washington Bridge. Violators subject to summons and/or fine.

GWB Sidewalk Hours of Operation

Bicyclists using the sidewalk are asked to walk their bikes for the safety of all sidewalk users. Bicyclists who choose to ride are asked to exercise caution and ride slowly. Pedestrians have the right-of-way at all times.

Users of the GWB sidewalk are encouraged to sign up for Bridge & Tunnel Alerts at http://btt.paalerts.com. Select the "Bicyclists/Pedestrian" Customer Type to have free alerts regarding sidewalk closures sent to your cell phone, smart phone, or e-mail account.

Sidewalk Open SAT
8/2
SUN
8/3
MON
8/4
TUE
8/5
WED
8/6
THU
8/7
FRI
8/8
SAT
8/9
6AM – 11:59PM SOUTH SOUTH SOUTH SOUTH SOUTH SOUTH SOUTH SOUTH

GWB Sidewalk Hours of Operation are subject to change and may be impacted by events such as inclement weather. To be notified of GWB sidewalk closures, please subscribe to Bridge & Tunnel Alerts at http://btt.paalerts.com/usersubscribe.aspx and select "George Washington Bridge Sidewalk" from the "Choose Facility" list.

OTHER AGENCIES' WORK THAT MAY IMPACT USERS OF THE G.W. BRIDGE

A construction project on I-95 Cross-Bronx Expressway may cause significant delays, including on the George Washington Bridge. Plan accordingly, and call 511 or check http://www.511NJ.org for details.

Lincoln Tunnel

Direction Dates Closures
TO NEW YORK (EASTBOUND) Friday, August 1, 11:59 p.m. until 8 a.m. Saturday morning

Friday, August 8, 11:59 p.m. until 8 a.m. Saturday morning
The New York-bound south tube is closed.
(Routine Maintenance)
TO NEW YORK (EASTBOUND) Friday, August 1, 11 p.m. until 7 a.m. Saturday morning

Saturday, August 2, 11:59 p.m. until 7 a.m. Sunday morning

Monday, August 4, 10 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 10 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 10 p.m. until 5 a.m. Thursday morning

Thursday, August 7, 10 p.m. until 5 a.m. Friday morning

Friday, August 8, 11 p.m. until 7 a.m. Saturday morning
Inbound traffic diverted to local streets due to rerouting of outbound traffic onto inbound helix.
(Lincoln Tunnel Helix Rehabilitation)
TO NEW JERSEY (WESTBOUND) Monday, August 4, 11 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 11 p.m. until 5 a.m. Wednesday morning
The New Jersey-bound north tube is closed. Customers advised to access the Lincoln Tunnel via the center tube using entrances at 36th Street and 9th Avenue, or 30th, 31st or 33rd streets between 9th and 10th avenues.
(Routine Maintenance)
TO NEW JERSEY (WESTBOUND) Friday, August 1, 11 p.m. until 8 a.m. Saturday morning

Saturday, August 2, 11 p.m. until 9 a.m. Sunday morning

Monday, August 4, 11 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 11 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 11 p.m. until 5 a.m. Thursday morning

Thursday, August 7, 11 p.m. until 7 a.m. Friday morning
The outbound helix is closed. Outbound helix traffic diverted to inbound helix traffic lanes.
(Lincoln Tunnel Helix Rehabilitation)
BOTH DIRECTIONS (EASTBOUND & WESTBOUND) Tuesday, August 5, 11 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 11 p.m. until 5 a.m. Thursday morning
One tube of the Lincoln Tunnel is closed. Weekdays, one additional tunnel lane in each direction closes at 12:30 a.m., traffic permitting, leaving one lane in each direction available.
(Routine Maintenance – Includes, but not limited to, the following: washing, sweeping, lighting, gutter cleaning and pump room inspections.)

Holland Tunnel

Direction Dates Closures
TO NEW YORK (EASTBOUND) Saturday, August 2, 11 p.m. until 5 a.m. Sunday morning

Sunday, August 3, 11 p.m. until 5 a.m. Monday morning

Monday, August 4, 11 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 11 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 11 p.m. until 5 a.m. Thursday morning

Thursday, August 7, 11 p.m. until 5 a.m. Friday morning
One eastbound tunnel lane is closed.
(Routine Maintenance – Includes, but not limited to, the following: tunnel wall washing)
TO NEW JERSEY (WESTBOUND) Sunday, August 3, 11 p.m. until 5:30 a.m. Monday morning

Monday, August 4, 11 p.m. until 5:30 a.m. Tuesday morning

Tuesday, August 5, 11 p.m. until 5:30 a.m. Wednesday morning

Wednesday, August 6, 11 p.m. until 5:30 a.m. Thursday morning

Thursday, August 7, 11 p.m. until 5:30 a.m. Friday morning
One westbound tunnel lane is closed. Lane closure time is traffic dependent.
(Routine Maintenance – Includes, but not limited to, the following: tunnel wall washing)

HOLLAND TUNNEL COMMERCIAL VEHICLE RESTRICTIONS

Both Directions: (EASTBOUND & WESTBOUND)

  • No Tractor-Trailers
  • No Three-Axle Dual-Unit Trucks
  • No Trucks With Four Or More Axles
  • Only two and three-axle single-unit trucks allowed.

Height Limit - 12 feet 6 inches
Width Limit - 8 feet

OTHER AGENCIES' WORK THAT MAY IMPACT USERS OF THE HOLLAND TUNNEL


NEW TRAFFIC PATTERN ALONG HUDSON STREET AND AT CANAL STREET ENTRANCE TO HOLLAND TUNNEL DURING ESSENTIAL WATER MAIN INSTALLATION

The New York City Department of Design and Construction announced traffic pattern changes on Hudson Street and at the Canal Street entrance to the Holland Tunnel that took effect September 19, 2010.

These changes are necessary to install new trunk water mains and reconstruct existing distribution water mains and utility infrastructure along Hudson Street and adjacent streets in the Tribeca West Historic District. A significant element of the project is the construction of a new trunk water main that will be connected to City Water Tunnel No. 3.

Motorists should follow detour signs to reach the tunnel via West Street and Canal Street or may use the Varick and Watts Street approaches. The work hours will be Monday-Friday from 7 a.m. to 10 p.m. and, when necessary, weekend hours will be 10 a.m. to 10 p.m.

The following traffic pattern changes will be in effect through the project's completion in 2015.

Traffic Pattern Changes

  • There will be no access to the Holland Tunnel from Hudson Street (at Canal Street) for the duration of the project.
  • Westbound & Eastbound motorists on Canal Street will still be able to enter the Holland Tunnel.
  • Hudson Street will be narrowed to two lanes within the 3-block construction zone from Franklin Street to Laight Street.
  • Northbound motorists on West Street will be permitted to turn right on to Canal Street to access Holland Tunnel at all times.

Traffic Mitigation Measures

  • No Stopping will be permitted within the construction zone
  • Parking along Hudson Street, within the project limits, will not be allowed
  • Detour and Variable Message Signs (VMS) will be located in and around the project to advise motorists
  • Pedestrian access to buildings and along sidewalks will be maintained at all times
  • Traffic Enforcement Agents will be located at key intersections within the project limits

Bayonne Bridge    |    Goethals Bridge    |    Outerbridge Crossing

 

Bayonne Bridge

Direction Dates Closures
TO NEW YORK (SOUTHBOUND) Friday, August 1, 11:59 p.m. around the clock until Sunday, August 3, 4 p.m.

Monday, August 4, 9 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 9 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 9 p.m. until 5 a.m. Thursday morning

Thursday, August 7, 9 p.m. until 5 a.m. Friday morning

Friday, August 8, 11:59 p.m. around the clock until Sunday, August 10, 4 p.m.
The New York-bound Bayonne Bridge is closed. All traffic diverted to Goethals Bridge. The Bayonne Bridge free weekend shuttle will operate Fridays from 8 a.m. to 8 p.m. ONLY. Saturday and Sunday service is canceled.
(Bayonne Bridge “Raise the Roadway” Navigational Clearance Project)
TO NEW JERSEY (NORTHBOUND) Friday, August 1, 11:59 p.m. around the clock until Sunday, August 3, 4 p.m.

Monday, August 4, 9 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 9 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 9 p.m. until 5 a.m. Thursday morning

Thursday, August 7, 9 p.m. until 5 a.m. Friday morning

Friday, August 8, 11:59 p.m. around the clock until Sunday, August 10, 4 p.m.
The New Jersey-bound Bayonne Bridge is closed. All traffic diverted to Goethals Bridge. The Bayonne Bridge free weekend shuttle will operate Fridays from 8 a.m. to 8 p.m. ONLY. Saturday and Sunday service is canceled.
(Bayonne Bridge “Raise the Roadway” Navigational Clearance Project)

BAYONNE, NEW JERSEY BAYONNE BRIDGE NAVIGATIONAL CLEARANCE PROJECT-RELATED STREET CLOSURES

  Dates Closures
  August 4 through August 8 West 4th, West 3rd and Gertrude Streets closed.
West 5th Street partially closed.
(Bayonne Bridge "Raise the Roadway" Navigational Clearance Project)

STATEN ISLAND, NEW YORK BAYONNE BRIDGE NAVIGATIONAL CLEARANCE PROJECT-RELATED STREET CLOSURES

  Dates Closures
  August 4 through August 8 One lane of Newark Avenue and one lane of Eaton Place closed.
Richmond Terrace will be closed between Nicholas Ave and Morningstar Road from 9pm – 5am nightly. No residents will be denied access to their homes and will be waived through by construction personnel.
(Bayonne Bridge "Raise the Roadway" Navigational Clearance Project)

Bayonne Bridge Sidewalk SAT
8/2
SUN
8/3
MON
8/4
TUE
8/5
WED
8/6
THU
8/7
FRI
8/8
SAT
8/9
SIDEWALK CLOSED AROUND-THE-CLOCK

BAYONNE BRIDGE VEHICULAR RESTRICTIONS

  • Height Limit - 12 feet 6 inches
  • Width Limit - 8 feet

Overdimensional and overweight trucks are prohibited from crossing the Bayonne Bridge at all times, until further notice. This change is necessary to accommodate ongoing Bayonne Bridge Navigational Clearance Project work.


BAYONNE BRIDGE SHUTTLE SERVICE

NOTE: Due to full weekend closure of Bayonne Bridge, the hourly Bayonne Bridge free weekend shuttle will operate on Friday, August 1 and Friday, August 8 from 8 a.m. to 8 p.m. ONLY. Service on Saturday, August 3, Sunday, August 4, Saturday, August 9 and Sunday, August 10 is canceled.

The Port Authority of New York & New Jersey operates shuttle service for pedestrians and bicyclists who wish to cross the Bayonne Bridge. This free service operates Friday-Sunday between the hours of 8 a.m. and 8 p.m. during the peak usage months of May-October for the duration of the Bayonne Bridge Navigational Clearance Project (also known as the "Raise the Roadway" construction project).

The shuttle service provides an alternative means of transportation for pedestrians and cyclists who traverse the Bayonne Bridge on the shared-use walkway. The walkway was closed earlier this month as construction crews install temporary standpipes and other fire safety equipment needed for the construction of the project. In order to protect the safety of pedestrians and bicyclists, the walkway will remain closed for the duration of the project.

Shuttles will run every hour and make two stops: one at 214 W 1st Street (West 1st street and JFK Boulevard) in Bayonne, New Jersey, and one at 209 Innis Street (Innis Street and John Street) in Staten Island, New York. The shuttles will be equipped with bike racks to accommodate bicyclists.



Shuttle Schedule (Friday-Sunday):
DEPART STATEN ISLAND DEPART BAYONNE
8:00 a.m.  8:30 a.m. 
9:00 a.m.  9:30 a.m. 
10:00 a.m.  10:30 a.m. 
11:00 a.m.  11:30 a.m. 
12:00 p.m.  12:30 p.m. 
1:00 p.m.  1:30 p.m. 
2:00 p.m.  2:30 p.m. 
3:00 p.m.  3:30 p.m. 
4:00 p.m.  4:30 p.m. 
5:00 p.m.  5:30 p.m. 
6:00 p.m.  6:30 p.m. 
7:00 p.m.  7:30 p.m. 

STATEN ISLAND RICHMOND TERR./TRANTOR PLACE RAMP CLOSURES TO BEGIN

The next phase of the Bayonne Bridge Navigational Clearance Project requires the closure of the Richmond Terrace/Trantor Place ramps that connect the span to local Staten Island streets.

These ramp closures remain in-place until further notice.

If you normally exit Route 440 using Exit 13-Richmond Terrace/Trantor Place, you will now use Exit 12-Forest Ave and Willow Road east to Trantor Place. Travel north on Trantor Place to reach your final destination.

Click to enlarge.

If you normally use the Richmond Terrace/Trantor Place on-ramp to access the Bayonne Bridge, you will now take Port Richmond Avenue south to Trantor Place to access the Forest Avenue on-ramp, which leads to the bridge.

Click to enlarge.

 


JFK BOULEVARD RAMP CLOSURES

The next phase of the Bayonne Bridge Navigational Clearance Project requires the closure of the Staten Island-bound JFK Boulevard On-Ramp and New Jersey-bound JFK Boulevard Off-Ramp.

Closure details and detour maps below:

Staten Island-Bound JFK Boulevard On-Ramp Closure

The Staten Island-bound JFK Boulevard on-ramp remains closed at all times through 2015.

Bayonne Bridge Closure Map

New Jersey-Bound JFK Boulevard Off-Ramp Closure

The New Jersey-bound JFK Boulevard off-ramp remains closed at all times through 2015.

Bayonne Bridge Closure Map

FULL BRIDGE CLOSURE

The Bayonne Bridge is completely closed to traffic during the following times:

  • Monday-Thursday, 9 p.m. until 5 a.m. the following morning
  • Friday, 11:59 p.m. until 8 a.m. Saturday morning

The bridge remains open Saturday night for Sunday and Sunday night for Monday.

Bayonne Bridge Full Closure Map

 

Goethals Bridge

Direction Dates Closures
TO NEW YORK (EASTBOUND)   There is no construction to report at this time.
TO NEW JERSEY (WESTBOUND) Friday, August 1, 11:59 p.m. until 8 a.m. Saturday morning

Monday, August 4, 11 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 11 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 11 p.m. until 5 a.m. Thursday morning

Thursday, August 7, 11 p.m. until 5 a.m. Friday morning

Friday, August 8, 11:59 p.m. until 8 a.m. Saturday morning
One New Jersey-bound bridge lane closed.
(Scuppers Replacement Prep Work)
 

Outerbridge Crossing

Direction Dates Closures
TO NEW YORK (EASTBOUND)   There is no construction to report at this time.
TO NEW JERSEY (WESTBOUND) Friday, August 1, 11:59 p.m. until 8 a.m. Saturday morning

Monday, August 4, 10 p.m. until 5 a.m. Tuesday morning

Tuesday, August 5, 10 p.m. until 5 a.m. Wednesday morning

Wednesday, August 6, 10 p.m. until 5 a.m. Thursday morning

Thursday, August 7, 10 p.m. until 5 a.m. Friday morning

Friday, August 8, 11:59 p.m. until 8 a.m. Saturday morning
One New Jersey-bound bridge lane closed.
(Parapet Work/Curb Repair)

OUTERBRIDGE CROSSING VEHICULAR RESTRICTIONS

  • Height Limit – 14 feet
  • Width Limit - 8 feet 6 inches
  • Wide-load and oversized commercial vehicles prohibited on New York-bound Outerbridge Crossing (May 27, 2014 – August 4, 2014)

PATH

NOTE: PATH advisory information is from Friday, August 1, 2014—Monday, August 4, 2014.

Passengers are reminded that smoking, eating, drinking, and carrying open food containers and alcoholic beverages on trains and in station areas, is strictly prohibited.

Follow PATH on Twitter: http://www.twitter.com/pathtrain

Subscribe to PATHAlerts at http://www.panynj.gov/alerts to receive cell phone or e-mail notifications of incidents or events that may delay your trip on PATH.

Have trips on your PATH SmartLink card refilled automatically.  Sign up for Automatic Replenishment online: http://www.pathsmartlinkcard.com/AutomaticReplenishment.html

For additional information regarding PATH service, please call 800 234-PATH/7284 or visit PATH online: http://www.panynj.gov/path


FRIDAY, August 1

Journal Square–33 Street via Hoboken (JSQ-HOB-33)

No planned service changes. Service operates on a weekday schedule.

Hoboken–33 Street (HOB-33)

No planned service changes. Service operates on a weekday schedule.

Newark–World Trade Center (NWK-WTC)

  • The last departure from WTC is 11:55 p.m., arriving at NWK at 12:17 a.m.
  • The last departure from NWK is 11:20 p.m., arriving at WTC at 11:42 p.m.

Hoboken–World Trade Center (HOB-WTC)

  • The last departure from WTC is 10:56 p.m., arriving at HOB at 11:06 p.m.
  • The last departure from HOB is 11:11 p.m., arriving at WTC at 11:21 p.m.

SATURDAY, August 2

Newark–World Trade Center (NWK-WTC)

No service to/from Exchange Place and World Trade Center. Service terminates at Journal Square. Transfer at Journal Square for Journal Square-33 Street (via Hoboken) train.

PATH Weekend Ferry Service

  • Paulus Hook Ferry Terminal to World Financial Center Ferry Terminal.
  • 8 a.m. until 10 p.m.
  • Ferries depart Paulus Hook every 15 minutes on the :00, :15, :30, :45.
    Last ferry from Paulus Hook: 9:45 p.m.
  • Ferries depart World Financial Center every 15 minutes on the :08, :23, :38, :53.
    Last ferry from World Financial Center: 9:53 p.m.
  • Fare: $2.50 one-way, $5.00 round-trip, $1.00 bike surcharge fee.

Map from World Financial Center Ferry Terminal to World Trade Center

Map to World Financial Center Ferry Terminal

Journal Square–33 Street via Hoboken (JSQ-HOB-33)

Additional service added to Journal Square-33 Street (via Hoboken) line to accommodate Manhattan-bound passengers transferring at Journal Square from Newark-Journal Square line.
Service on Journal Square-33rd Street (via Hoboken) line will depart every 10 minutes, with additional service between Newark and Journal Square in both directions from approximately 5 p.m. until approximately 11 p.m. to accommodate passengers attending the New York Red Bulls' home game at Red Bull Arena.


SUNDAY, August 3

Newark–World Trade Center (NWK-WTC)

No service to/from Exchange Place and World Trade Center. Service terminates at Journal Square. Transfer at Journal Square for Journal Square-33 Street (via Hoboken) train.

PATH Weekend Ferry Service

  • Paulus Hook Ferry Terminal to World Financial Center Ferry Terminal.
  • 8 a.m. until 10 p.m.
  • Ferries depart Paulus Hook every 15 minutes on the :00, :15, :30, :45.
    Last ferry from Paulus Hook: 9:45 p.m.
  • Ferries depart World Financial Center every 15 minutes on the :08, :23, :38, :53.
    Last ferry from World Financial Center: 9:53 p.m.
  • Fare: $2.50 one-way, $5.00 round-trip, $1.00 bike surcharge fee.

Map from World Financial Center Ferry Terminal to World Trade Center

Map to World Financial Center Ferry Terminal

Journal Square–33 Street via Hoboken (JSQ-HOB-33)

Service on Journal Square-33 Street (via Hoboken) line will depart every 10 minutes from 10:00 a.m. to 10:00 p.m


Notes:

STATION(S) NOTE
Christopher St Christopher Street Station closed on 1st and 3rd Sunday of each month, from 11:59 p.m. until 5 a.m. Monday morning, for station cleaning. Enter PATH using 9th St Station.
(Upcoming Christopher St Station Sunday night closures: August 10, August 24, September 14, September 28.)
9 St 9 St Station closed on 2nd and 4th Sunday of each month, from 11:59 p.m. until 5 a.m. Monday morning, for station cleaning. Enter PATH at either Christopher St or 14 St stations.
(Upcoming 9 St Station Sunday night closures: August 3, August 17, September 7, September 21.)
14 St & 23 St During overnight hours, all PATH service at 14 St Station or 23 St Station may operate from that station's uptown or downtown track. Signage is posted at that the entrance of the affected station(s) when this single-track operation is in effect.
23 St New York City Transit construction has closed 2 of 4 mutually shared staircases at 23rd Street Station, resulting in delays for PATH customers exiting the station, especially during peak periods. Customers are advised to consider exiting PATH at 14th Street or 33rd Street stations as an alternative.
33 St Passageway from PATH to NYC Subway N, Q, and R trains closed daily from 11 p.m. until 5 a.m. Use NYC Subway entrance at 34 St & 6 Av.
33 St 30th Street entrance closes weekdays at 7:30 p.m., reopening 6:30 a.m. the following morning. Entrance closed weekends.

Port Authority Bus Terminal

There are no temporary bus gate reassignments to report.

Airports

LaGuardia Airport

Parking

To plan ahead and check occupancy or to make an online reservation for a space in Lots 2 or 4, click here. Free shuttle buses are running between all parking lots and all terminals. Please allow additional time to travel to your terminal.


AirTrain JFK

There are no service changes to report at this time.

AirTrain Newark

Dates Notice

10:00 pm Saturday, August 2 to
8:00 am Sunday, August 3

There will be no AirTrain Newark service system-wide due to scheduled maintenance. Free shuttle bus service will be provided between Newark Airport Station, Terminals A, B, C and Stations P1, P2, P3 and P4 (parking lot/rental car stations). See a Customer Care Representative for assistance and allow extra time when traveling to and from Newark Airport during this time.

Other Events

Date Time Event Location
Friday, August 1, 2014 7:00 p.m. Blake Shelton in Concert Madison Square Garden
Saturday, August 2, 2014   No events.  
Sunday, August 3, 2014   No events.  

Web Site Disclaimer
© 2001-CurrentYear The Port Authority of New York and New Jersey. All Rights Reserved.

The Port Authority of New York and New Jersey
(212) 435-7000  •  225 Park Avenue South, New York, NY 10003