Environmental Impact Statement Goethals Bridge Replacement Logo
 
Overview - General Conformity
 

In accordance with the applicable requirements of the General Conformity Rule (pursuant to the Clean Air Act) and given the findings that the estimated annual emission rates of two pollutants (CO and NOx) are predicted to exceed the General Conformity applicability thresholds during three years of the GBR Project’s construction period, the USCG issued its Draft General Conformity Determination (see FEIS Appendix N.4). Public notice of the Draft Determination was placed in the Staten Island Advance and the Star Ledger.  The public review period for the Draft Determination ended October 15, 2010. The Final General Conformity Determination was signed by the Coast Guard on January 14, 2011, and was published in the Record of Decision package.  Public notice of the Final Determination was placed in the Staten Island Advance and the Star Ledger on 1/31/11 and 2/01/11, respectively.

All public comments on the Draft General Conformity Determination and respective USCG responses were posted on the Federal Docket, under docket number USCG–2009–0097.

 
HOME USCG Logo
 
GBMP EIS Overview Link
  Steps in the Process
  NEPA Requirements
  Notice of Intent
  Scoping Process
  Purpose and Need
  Goals
  Preliminary Alternatives
  Potential Issues
  Refined Project Alternatives for DEIS Analysis
  Study Area
  Cultural Resources and Section 106 Consultation
  Draft EIS Published
  Formal Public Meetings
  Final EIS (FEIS) Published
  Preferred Alternative Selected - New Alignment South
  Modifications in the FEIS Since Publication of the DEIS
  General Conformity
  Record of Decision
  Essential Fish Habitat
  EIS Timeline
  Additional Resources
   
EIS Documents Link
Links Link
FAQs Link
Glossary of Terms Link
Participants Link
 
What's New Link
» Record of Decision (ROD) for Goethals Bridge Replacement Executed on January 31, 2011
» Final EIS (FEIS) Published in August 2010
» Preferred Alternative Selected – New Alignment South